| Projects |
| Client TUDELA VEGUIN S.A. | |
Project Location La Robla Plant, León (Spain) |
|
Date 2004 |
|
| Description Design and supply of a 9 meter horizontal travel loading spout positioner for railcar bulk loading. |
|
| Client TAIM TFG S.A. | |
Project Location Ardakan Pelletezing Plant (Iran) |
|
Date 2004 |
|
| Description Design and supply of severe duty slide-gate valves forbelt conveyor feeding with screened pellet. | |
| Client TRADEHI S.L. | |
Project Location TUDELA VEGUIN S.A., Aboño Plant, Asturias (Spain) |
|
Date 2003 |
|
| Description 2 slag silo bottom aeration systems. Silo discharge systems and airslide conveying with inline valves to bucket elevators and to 3 kilns. | |
| Client CHRISTIAN PFEIFFER Maschinenfabrik Gmbh / Adrián Consultores S.L. | |
Project Location TDCIM S.A., Sines (Portugal) |
|
Date 2003 |
|
| Description Full airslide conveying installation with inline valves for cement mill plant. | |
| Client TUDELA VEGUÍN S.A. | |
Project Location Avilés Harbour, Asturias (Spain) |
|
Date 2003 |
|
Description 3 cement silo bottom aeration systems. Silo discharge to F-K pump feeding and bulk loading systems. |
|
| Client ACERIE DE L’ATLANTIQUE S.A. | |
Project Location Bayonne (France) |
|
Date 2002 |
|
| Description Iron powder bulk loading system. | |
| Client CEMENT INVESTMENT S.L. | |
| Project Location Granadilla de Abona Plant, Tenerife (Spain) | |
Date 2001 |
|
| Description 3 silo bottom aeration systems. Silo discharge, airslide conveying with inline valves and bulk loading systems. | |
| Client MATERIALES DEL ATLÁNTICO S.A. | |
Project Location Narón Plant, Pontevedra (Spain) |
|
Date 2001 |
|
| Description 2 silo bottom aeration systems. Pneumatic conveying of cement for silo loading. Screw pump feeding with airslide conveying line. | |
| Client VALENCIANA DE CEMENTOS S.A. (CEMEX). | |
Project Location Muel Plant, Zaragoza (Spain) |
|
Date 2001 |
|
| Description Cement bulk loading. | |
| Client CEMENT INVESTMENT S.L. | |
Project Location Granadilla de Abona Plant, Tenerife (Spain) |
|
Date 2000 |
|
| Description 3 silo bottom aeration systems. Silo discharge, airslide conveying with inline valves and bulk loading systems. | |
| Client STHIM MAQUINARIA S.A. | |
Project Location CEMENTOS LA CRUZ AZUL S.C.L. (Mexico). |
|
Date 2000 |
|
| Description Discharge systems for raw material and cement. Airslide conveying with inline valves to kiln and silos. | |
| Client LEMONA INDUSTRIAL S.A. | |
Project Location Lemona, Vizcaya (Spain). |
|
Date 1998 |
|
| Description Cement conveying from 3 mills to bucket elevators for bicameral silo loading with airslide conveyors and in-line valves. | |
| Client HORMIGONES Y ÁRIDOS DE CEUTA S.A. | |
Project Location Ceuta (Spain) |
|
Date 1998 |
|
| Description 4 silo loading pneumatic conveying systems from ship. Silo bottom aeration, discharge and bulk loading systems. | |
| Client VALENCIANA DE CEMENTOS S.A. (CEMEX). | |
Project Location Tenerife Plant (Spain) |
|
Date 1997 |
|
| Description Cement distribution to 6 silos with airslide conveyors and in-line valves. Discharge and bulk loading systems. | |